US Court: Transcanada’s Keystone XL Profits More Important than Environment

By: Monday October 14, 2013 7:57 am

In a 2-1 decision, the Court sided with Transcanada, and by extension, the U.S. Army Corps of Engineers. The Court ruled, “the threatened environmental injuries were outweighed by the financial harm that the injunction would cause Transcanada.”

 

Obama’s Former PR Flack Anita Dunn Pitches “Ethical Oil” Keystone XL Ad

By: Wednesday October 9, 2013 3:55 pm

Ezra Levant is the man behind an attempt to re-frame the Alberta tar sands as “ethical oil.” “Ethical” – Levant’s deceptive public relations campaign argues of the tar sands “carbon bomb” – because it doesn’t come from the war-ridden and human rights-abusing Middle East.

Now, the “ethical oil” campaign has a new backer: Anita Dunn, former White House Communications Director for President Barack Obama.

Obama State Dept. Leaving Citizens in the Dark About Exact Keystone XL Pipeline Route

By: Friday June 28, 2013 5:00 pm

Believe it or not, the precise route of TransCanada’s Keystone XL tar sands pipeline remains shrouded in mystery.

Of course, both TransCanada and the U.S. State Department have revealed basic Keystone XL route maps. And those who follow the issue closely know the pipeline would carry Alberta’s tar sands diluted bitumen or “dilbit” southward to Port Arthur, TX refineries and then be exported to the global market.

But the real path is still a secret.

Standing Tall for Landowner Rights

By: Monday May 20, 2013 11:30 am

Julia Trigg Crawford of Direct, Texas, is the manager of a 650-acre farm that her grandfather first bought in 1948. The farm produces mostly corn, wheat, and soy. On its north border is the Red River; to the west is the Bois d’Arc Creek.

TransCanada is an Alberta-based corporation that is building the controversial Keystone Pipeline that will carry bitumen—thicker, more corrosive and toxic, than crude oil—through 36-inch diameter pipes from the Alberta tar sands to refineries on the Gulf Coast, mostly to be exported. The $2.3 billion southern segment, about 485 miles from Cushing, Okla., to the Gulf Coast is nearly complete. With the exception of a 300-mile extension between Cushing and Steele City, Neb., the rest of the $7 billion 1,959 mile pipeline is being held up until President Obama either succumbs to corporate and business pressures or blocks the construction because of environmental and health concerns.

Oops, Inc.: Industry-Tied Firm Cleaning Up Arkansas Tar Sands Spill, Same Firm Also Contracted for Keystone XL

By: Sunday April 14, 2013 7:00 am

Arkansas’ Attorney General Dustin McDaniel has contracted out the “independent analysis of the cleanup” of the ExxonMobil Pegasus tar sands pipeline spill to Witt O’Brien’s, a firm with a history of oil spill cover-ups, a DeSmogBlog investigation reveals.

SUPPORT FIREDOGLAKE
Follow Firedoglake
TODAY’S TOP POSTS
CSM Ads advertisement
Advertisement
Upcoming FDL Book Salons

Saturday, August 30, 2014
2:00 pm Pacific
The Nixon Defense: What He Knew and When He Knew It
Chat with John Dean about his new book.

Sunday, August 31, 2014
2:00 pm Pacific
Imagine: Living In A Socialist USA
Chat with Pau LeBlanc, Debby Smith, and Michael Steven Smith about their new book. Hosted by Deena Stryker

GET UPDATES

Sign up to receive Firedoglake's headlines by email: